Friday, 18 April 2014 00:00

PETLAS TYRE PLANT

Written by

541.225.000 adet/yıl KIRŞEHİR/TÜRKİYE

petlas-lastik-fabrikaSteel structure
High/low pressure process piping fabrication and installation
Equipment installation lnstrumentation
3 x 38.5 tons/hoursteam capacity
Boilerfabrication and installation
Precommissioning , commissioning
and start-up
Ope ration, maintenance and repairworks forthree years with more than 500 personnel
Tyre wagons fabrication and installation

 

 

petlas-lastik-fabrika2

Thursday, 17 April 2014 00:00

TEJEN AMMONİA AND UREA PLANT

Written by

TECEN / TÜRKMENİSTAN

amonyak-ure-tesis

Ammonia: 600 tons/dayUrea: 1050 tons/day Ammonia Complex: 13 Units
Urea Complex: 8 Units Auxiliary System :12 Units Steam Boiler : 145 Vh
Power Generator: 2x18,75 MVA Mechanical Erection Works:
• Synthesis and Production Units
• Boiler
• Reformer
• Turbine& Compressors
• High/LowPressure Piping
• Water Treatment System
• Auxiliary Units
• Refractory &Rubber Lining
• Stacker &Reclaimer
• Steel Construction

 

 

 

 

amonyak-ure-tesis2

Thursday, 17 April 2014 00:00

TUPRAS KIRIKKALE REFINERY ISOMERİZATİON PLANT

Written by

 KIRIKKALE / TURKEY

kirikkale-izomerizasyon-tesisiThe design, supply, construction and erection services of project have been fulfilled on turnkey lump sum basis by consortium of TEKNOTES and SOFRESID S.A./France. The Provisional Acceptance of the project has been attained in 1997 and the Final Provisional Acceptance in1999. in addition to the complete detailed design and partial basic engin nering, all construction and erection services, alsa the supply of steel structure, static equipments (Heat exchangers,Drums , Adsorbers , Columns ete.), electrical equipment and materials ete. have been carried aut by TEKNOTES. At the piant, the low Octane Number Naphtha is used as raw material and unleaded gasoline is produced as end product.

 

 

 kirikkale-izomerizasyon-tesisi3

 TÜPRAŞ KIRIKKALE RAFİNERİSİ HYDROCKER TESİSİ

hydrocraker-tesisiYüksek / alçak basınç proses borulama imalatı ve montajı
Çelik konstrüksiyon imalatı ve montajı
İnşaat işleri Döner ekipman montajı
Elektrik ve enstrümantasyon Refakat hatları imalatı ve montajı
Ex-Proof Tavan Vinci imalat ve montajı
Ekipman Montajı
Rewamp ünitesi imalatı ve montajı
Detay mühendislik

hydrocraker-tesisi2

 

Thursday, 17 April 2014 00:00

KANGAL THERMAL POWER PLANT

Written by

2 x 150 MW KANGAL / SIVAS / TURKEY

kangal-termik-santrBoiler erection
High/low pressure proses piping fabrication and installation
Off-site piping fabrication and installation
Civil works
Rotary equipment erection
Electrical works and instrumentation
Equipment installation
Fabrications and installations in the machine hail
Fabrication, supply and installation of mud scrappers tor raw water intake pools

 

 

sivas-kangal-termik-santr

 

Thursday, 17 April 2014 00:00

AMBARLI NATURAL GAS COMBINED CYCLE POWER PLANT

Written by

9 x 150 MW AMBARLI / ISTANBUL / TURKEY

ambarli-dogalgaz-cevirim-santrali

 


Mechanical Works
Electrical
lnstrumentation and comtrol
High/low pressure proses piping fabrication and installation
Steel structure fabrication and installation

 

 

ambarli-dogalgaz-cevrim-santr

Page 3 of 3