ORHANELİ THERMAL POWER PLANT FLUE GAS DESULPHURIZATION PLANT

1 x 210 MW-BURSA-TURKEY

orhaneli-termik-santrali1 x 21O MW Orhaneli Thermal Power Plant Flue Oesulphurization Plant was constructed by the consortium TEKNOTES and NOELL - KRC / Germany and put into operation on 21.11.1997.The limestone wet scrubbing process retrofitted to the Orhaneli Power Plant is the most common commercial process in the world for a like power plants. A limestone powder water slurry is the scrubbing medium and gypsium slurry is the end product. The plant has SO, removal efficiency of 95%. TEKNOTES SO, has implemented all detail engineering, civil works, ıocal material supply, mechanical and equipment erection, process piping, raw water treatment plant, electrical material supply and installation, instrumentation and commissioning activities forthis plant. 

 

 

PROCESS SCHEME

orhaneli-termik-santrali-akıs-sema

orhaneli-termik-santrali-bacagazi-

 

ORHANELİ TERMİK SANTRALİ KÖMÜR PARK MAKİNESİ MONTAJI VE İŞLETMEYE ALINMASI

770 tons/hour BURSA / TÜRKİYE

orhaneli-komur-park-makinesi 1

Read 13293 times

Referance Map