TEJEN AMMONİA AND UREA PLANT

TECEN / TÜRKMENİSTAN

amonyak-ure-tesis

Ammonia: 600 tons/dayUrea: 1050 tons/day Ammonia Complex: 13 Units
Urea Complex: 8 Units Auxiliary System :12 Units Steam Boiler : 145 Vh
Power Generator: 2x18,75 MVA Mechanical Erection Works:
• Synthesis and Production Units
• Boiler
• Reformer
• Turbine& Compressors
• High/LowPressure Piping
• Water Treatment System
• Auxiliary Units
• Refractory &Rubber Lining
• Stacker &Reclaimer
• Steel Construction

 

 

 

 

amonyak-ure-tesis2

Read 8612 times

Referance Map