ARAK / IRAN
581.800.000 ton/year IZMIR / TURKEY
541.225.000 adet/yıl KIRŞEHİR/TÜRKİYE
Steel structure
High/low pressure process piping fabrication and installation
Equipment installation lnstrumentation
3 x 38.5 tons/hoursteam capacity
Boilerfabrication and installation
Precommissioning , commissioning
and start-up
Ope ration, maintenance and repairworks forthree years with more than 500 personnel
Tyre wagons fabrication and installation
TECEN / TÜRKMENİSTAN
Ammonia: 600 tons/dayUrea: 1050 tons/day Ammonia Complex: 13 Units
Urea Complex: 8 Units Auxiliary System :12 Units Steam Boiler : 145 Vh
Power Generator: 2x18,75 MVA Mechanical Erection Works:
• Synthesis and Production Units
• Boiler
• Reformer
• Turbine& Compressors
• High/LowPressure Piping
• Water Treatment System
• Auxiliary Units
• Refractory &Rubber Lining
• Stacker &Reclaimer
• Steel Construction
RAFİNERİ VE PETROKİMYA TESİSLERİ
KIRIKKALE / TURKEY
The design, supply, construction and erection services of project have been fulfilled on turnkey lump sum basis by consortium of TEKNOTES and SOFRESID S.A./France. The Provisional Acceptance of the project has been attained in 1997 and the Final Provisional Acceptance in1999. in addition to the complete detailed design and partial basic engin nering, all construction and erection services, alsa the supply of steel structure, static equipments (Heat exchangers,Drums , Adsorbers , Columns ete.), electrical equipment and materials ete. have been carried aut by TEKNOTES. At the piant, the low Octane Number Naphtha is used as raw material and unleaded gasoline is produced as end product.
TÜPRAŞ KIRIKKALE RAFİNERİSİ HYDROCKER TESİSİ
Yüksek / alçak basınç proses borulama imalatı ve montajı
Çelik konstrüksiyon imalatı ve montajı
İnşaat işleri Döner ekipman montajı
Elektrik ve enstrümantasyon Refakat hatları imalatı ve montajı
Ex-Proof Tavan Vinci imalat ve montajı
Ekipman Montajı
Rewamp ünitesi imalatı ve montajı
Detay mühendislik