Super User

Super User

karabuk-hava-ayrıstırma

Engineering and design work of the process, heating, instrumentation piping for steel milis, continuous casting
and billets milis

Gas oxygen: 6400 Nm3 / h
Liquid oxygen: 600 Nm3/ h
Gas nitrogen: 4000 Nm3/ h
Liquid nitrogen: 150 Nm3 / h
Liquid argon min.: 245 Nm3 / h

 

 

kısladag-altın-madeni2

Friday, 18 April 2014 00:00

KISLADAG GOLD MİNE

kısladag-altın-madeni

Teknotes had a role in Kışladağ Gold Project owned by Eldorado Gold as mechanica,l electrical and buried services contractor. Our company completed the erection of primary gyratory crusher, secondary and tertiary crushers, coarse and tine ore screens, conveyors and ADR plant's ( the latest place for the pure gold ) mechanical and electrical installations successfu lly. 1,26 grams of gold are produced from 1 tones of ore in Kışladağ Gold Project. The plant will run 6 days and 24 hours by shift system.

 

kısladag-altın-madeni2

Friday, 18 April 2014 00:00

PETLAS TYRE PLANT

541.225.000 adet/yıl KIRŞEHİR/TÜRKİYE

petlas-lastik-fabrikaSteel structure
High/low pressure process piping fabrication and installation
Equipment installation lnstrumentation
3 x 38.5 tons/hoursteam capacity
Boilerfabrication and installation
Precommissioning , commissioning
and start-up
Ope ration, maintenance and repairworks forthree years with more than 500 personnel
Tyre wagons fabrication and installation

 

 

petlas-lastik-fabrika2

Thursday, 17 April 2014 00:00

TEJEN AMMONİA AND UREA PLANT

TECEN / TÜRKMENİSTAN

amonyak-ure-tesis

Ammonia: 600 tons/dayUrea: 1050 tons/day Ammonia Complex: 13 Units
Urea Complex: 8 Units Auxiliary System :12 Units Steam Boiler : 145 Vh
Power Generator: 2x18,75 MVA Mechanical Erection Works:
• Synthesis and Production Units
• Boiler
• Reformer
• Turbine& Compressors
• High/LowPressure Piping
• Water Treatment System
• Auxiliary Units
• Refractory &Rubber Lining
• Stacker &Reclaimer
• Steel Construction

 

 

 

 

amonyak-ure-tesis2

 KIRIKKALE / TURKEY

kirikkale-izomerizasyon-tesisiThe design, supply, construction and erection services of project have been fulfilled on turnkey lump sum basis by consortium of TEKNOTES and SOFRESID S.A./France. The Provisional Acceptance of the project has been attained in 1997 and the Final Provisional Acceptance in1999. in addition to the complete detailed design and partial basic engin nering, all construction and erection services, alsa the supply of steel structure, static equipments (Heat exchangers,Drums , Adsorbers , Columns ete.), electrical equipment and materials ete. have been carried aut by TEKNOTES. At the piant, the low Octane Number Naphtha is used as raw material and unleaded gasoline is produced as end product.

 

 

 kirikkale-izomerizasyon-tesisi3

 TÜPRAŞ KIRIKKALE RAFİNERİSİ HYDROCKER TESİSİ

hydrocraker-tesisiYüksek / alçak basınç proses borulama imalatı ve montajı
Çelik konstrüksiyon imalatı ve montajı
İnşaat işleri Döner ekipman montajı
Elektrik ve enstrümantasyon Refakat hatları imalatı ve montajı
Ex-Proof Tavan Vinci imalat ve montajı
Ekipman Montajı
Rewamp ünitesi imalatı ve montajı
Detay mühendislik

hydrocraker-tesisi2