ENERJİ ÜRETİM TESİSLERİ
ENERGY PRODUCTION PLANTS
ÇATALAĞZI TERMİK SANTRALI KÖMÜR YIKAMA KURUTMA TESİSİ
VE UZUN MESAFELİ KONVEYÖR HATTI
CATALAGZI THERMAL POWER PLANT SLUDGE DEWATERING AND
COAL MIXING-WASHERY PLANT WITH LONG DISTANCE BELT CONVEYOR
3560 m, 400 tons/h ÇATALAĞZI / ZONGULDAK / TÜRKİYE
Uzunluk 3560 m Length 3560 m
Kapasite 400 ton/saat Capacity400 tons/hour
Çelik konstrüksiyon imalat ve montajı Steel structure fabrication and installation
Döner ekipman montajı Rotary equipment erection
Enstrümantasyon Instrumentation
OG / AG elektrik montaj işleri Medium-Voltageand Low-Voltage(MV/LV) electrical installation works
Ekipman montajı Equipment erection
Devreye alma Commissioning