EREGLİ/ZONGULDAK/TURKEY

erdemir-gaz-holder-tankıFabrication and installation of the complete tank Proses Process piping fabrication and installation
lnstrumentation

 

 

 

 

 

 

 

erdemir-gaz-holder-tankı2

Published in Sanayi Tesisleri

karabuk-hava-ayrıstırma

Engineering and design work of the process, heating, instrumentation piping for steel milis, continuous casting
and billets milis

Gas oxygen: 6400 Nm3 / h
Liquid oxygen: 600 Nm3/ h
Gas nitrogen: 4000 Nm3/ h
Liquid nitrogen: 150 Nm3 / h
Liquid argon min.: 245 Nm3 / h

 

 

kısladag-altın-madeni2

Published in Sanayi Tesisleri
Friday, 18 April 2014 00:00

PETLAS TYRE PLANT

541.225.000 adet/yıl KIRŞEHİR/TÜRKİYE

petlas-lastik-fabrikaSteel structure
High/low pressure process piping fabrication and installation
Equipment installation lnstrumentation
3 x 38.5 tons/hoursteam capacity
Boilerfabrication and installation
Precommissioning , commissioning
and start-up
Ope ration, maintenance and repairworks forthree years with more than 500 personnel
Tyre wagons fabrication and installation

 

 

petlas-lastik-fabrika2

Thursday, 17 April 2014 00:00

TEJEN AMMONİA AND UREA PLANT

TECEN / TÜRKMENİSTAN

amonyak-ure-tesis

Ammonia: 600 tons/dayUrea: 1050 tons/day Ammonia Complex: 13 Units
Urea Complex: 8 Units Auxiliary System :12 Units Steam Boiler : 145 Vh
Power Generator: 2x18,75 MVA Mechanical Erection Works:
• Synthesis and Production Units
• Boiler
• Reformer
• Turbine& Compressors
• High/LowPressure Piping
• Water Treatment System
• Auxiliary Units
• Refractory &Rubber Lining
• Stacker &Reclaimer
• Steel Construction

 

 

 

 

amonyak-ure-tesis2

Thursday, 17 April 2014 00:00

KANGAL THERMAL POWER PLANT

2 x 150 MW KANGAL / SIVAS / TURKEY

kangal-termik-santrBoiler erection
High/low pressure proses piping fabrication and installation
Off-site piping fabrication and installation
Civil works
Rotary equipment erection
Electrical works and instrumentation
Equipment installation
Fabrications and installations in the machine hail
Fabrication, supply and installation of mud scrappers tor raw water intake pools

 

 

sivas-kangal-termik-santr

 

teknotes-can-termik-santrali

This project is included in the investment program in 1996 in order to use the 70,000,000 tons highsulphur lignite coal reserve located 1996 near Can for power generation purposes and to meet the ever-increasing domestic demand for energy.

 

 

 

 

 

 

 

CHARACTERISTICS OF PLANT

STEAM GENERATOR

can-buhar-kazanı 


Manufacturer:     ALSTOM POWER
Type:                 Circulating Fluidized Bed
Efficiency:          92%
Steam Capacity: 462 t/h

STEAM TURBINE

can-buhar-turbini 

Manufacturer:    ALSTOM POWER
Type Combined: HP/IP + Single Flow LP
Power:              160MW
RPM:                 3000


Condenser Pressure 0.085 bar abs.

 

 

 

 

 

 

GENERATOR

jenerator 

Manufacturer:         ALSTOM POWER
Type:                     Synchronous
Power:                   177MVA
Voltage:                 15kV
Short Circuit Ratio: 0.54
Power Factor:         0.90

 

BOILER PROCESS SCHEME                   

 can-termik-akis-semasi

 

SCOPE OF TEKNOTES

Projeci Managementfor its part
Construction Management
Basic and Detail Engineering
Procurement
Manufacturing of Steel Structure
Manufacturing of Ducting System
Commissioning

 AII civil construclion activities
Excavation and backfilling fora total of 2.500.000 cubic meters Substructure and superstructure works fora total of 70.000 cubic meters concrete foundations
Asphalt pavement access roads fora total of 2500 cubic meters lnternal concrete road and pavementfor atotal of 37.000 sq. meters Reinforced Concrete bridge lenghtfor atotal of 50 meters
4 pieces of limestone silos, each capacity 6000 cubic meters (sliding forework system, silo diameter 14 meters, height 36 meters)
Ash disposal area 200.000 cubic meters filing embankment 8 pieces logistics bulding (non-technical buildings)
9000 sq. meters total closed area of buildings
6000 meters service road and open drainage channel
500 meters bored piles diameter 80 centimeters, lenght 12 meters
2 pieces chimney (corten steel) diameter 4,5 meters, height50 meters AII architectural works
Furnishings ofthe buildings

AII Mechanical Erection Works lora total of 42.000 !ons including
Boilers with all accessories Electrostatic precipitars
Turbine And Generator sets with all accessories Rotating machines
Fabricating Equipments
Coal , Ash and Lime Handling Systems Storage Tanks
WaterTreatmentPlants Handling Equipments FOSystems
LP, MP, HP lndoor and Outdoor Piping Fire Fighting and Extinguishing System
Gas Production plants, compressed air plants, auxiliary boiler packages, workshop and laboratories equipments
and other miscellaneous equipments. Steel Structure
HVAC
Refractories
Heat and sound lnsulation Cladding
Painting

AII Electrical Works including
Complete MW/LWSwitchgear System 21 pieces MW/LWTransformers
86.000 meters Cable Tray
700.000 meters Cabling
All lnstrumentation and Control Works Pre-Commissioning
Participating in commissioning and start-up

 

canakkale-can-termik-santrali7

Monday, 14 April 2014 00:00

REFERENCE

Published in referanslarımız